EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (676)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
-
Wiring
-
Glareshield LED lights
-
Glare shield GPS and...
-
Wiring
-
Wiring
-
Wiring, Etc
-
Wiring Cleanup
-
Wiring
-
Wiring
-
Wiring and firewall
-
Pitot Static lines
-
Wiring
-
Main Bus
-
Wiring
-
wiring
-
Wiring
-
Wiring Testing
-
Wiring
-
Wiring
-
Stick Grip Wiring
-
Wiring
-
ELT and Stick Grip...
-
Wiring
-
Wiring
-
Wiring
-
Wiring
-
Panel Power Up
-
First Power-Up of Panel
-
Antenna Leads
-
Panel Supports
-
Remote Avionics
-
Avionics Tray
-
Avionics Tray Backup...
-
Backup Battery Install
-
Remote Avionics Tray
-
Remote Avionics Install
-
Avionics tray
-
Removed avionics...
-
Avionics mounting
-
Instrument panel
-
First Panel Install
-
First uncrating of...
-
Remote Avionics fit...
-
GPS Antenna Doubler...
-
VHF 2 Antenna Mount...
-
Antenna Doublers
-
Antenna Doubler
-
Mounts
-
AP Roll Servo
-
AP Servos
-
ELT and VHF #1...
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (3)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (50)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1988
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Jun 20, 2022
Removed avionics boxes and prep for paint
- (3 hours)
Category: Avionics
Removed and boxed up remote avionics boxes. Transferred locations of remote boxes to template that will be used to cut aluminum avionics tray. Bundled wire harnesses on panel prior to removal for painting interior panels. Test fit rudder return cable tunnel. Removed all interior trim panels for painting.
Avionics layout template (1).jpg
Avionics layout template (2).jpg
Panel bundled for removal prior to painting interior (1).jpg
Panel bundled for removal prior to painting interior (2).jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.